Ændringer

[av_breadcrumbs]

Værdien af at stille krav:

  • Ændringer i et byggeprojekt giver udfordringer for både kvaliteten, tiden og økonomien. Derfor er der i det nye AB18 system indført nye bestemmelser om ændringer, hvor det vigtigste er at der skal meldes ændringer ind hurtigst muligt, og at bygherren skal føre en ændringslog som dokumenterer ændringer, krav, anmodninger og meddelelser. Det skal selvfølgelig gøres digitalt, fx i form af et dashboard ovenpå data fra de tekniske forespørgsler/Requests For Information (RFI) samt de aftalte ændringer.
  • Ændringer som indarbejdes i 4D/5D BIM giver et bedre overblik over konsekvenser for projektets økonomi og tidsplan.

Opmærksomhedspunkter

  • Mange små ændringer kan hurtigt vokse til større summer, og derfor er en løbende registrering og godkendelse bedre end at “samle sammen” under en bestemt beløbsgrænse, som man traditionelt har gjort “på papir”, og som der stadig er lagt op til i ABT18.
  • I en ren Totalentreprise kontakt skal Bygherren kun sørge for at administrere egne ændringer.
  • I samlede kontrakter med IPD elementer bør ændringer være sporbare i forhold til tekniske forspørgsler/Requests For Information, RFIer. Der bør være tale om to forskellige workflows, hvor tekniske forespørgsler besvares først, og kun de egentlige ændringer går videre til næste workflow med godkendelse af økonomiske og tidsmæssige konsekvenser.
Lovgivning:
  • Ingen direkte lovgivning. 
Aftalegrundlag:
  • AB18 , §23 mfl.
Internationale standarder:
  • Ingen direkte relaterede standarder
Teknisk fælleseje:
  • IKT specifikation 
Tjekliste
  • Har I defineret en datamodel for jeres projekt i IKT specifikationen..?
  • Har I taget stilling til hvilken software I vil bruge til registreringen af ændringer?
  • Har I taget stilling til hvordan I får data ud af softwaren igen..?
  • Er softwaren brugervenlig..?
  • Har softwaren de nødvendige workflows og kontroller, se listen HER:
  • Har I taget stilling til hvordan der administreres risici og reserver (uforudseelige udgifter) på projektet? Det skal hænge sammen med ændringerne. Dvs. at softwares skal udveksle data.
Udbudstekster, eksempler

Note: Nedenstående eksempel på udbudstekst er udtryk for bygherrens valg på tidspunktet for udbud af den konkrete byggesag. Bygherreforeningen anbefaler, at man fremadrettet bruger det nye danske aftalesystem, dvs. AB18, ABR18, ABT18 mv., som grundlag.

Ændringer, udbudstekster fra case Tønsberg projektet:

11.1 Changes to Target Cost
There will be no changes to the Target Cost or the ICL unless one of the conditions in Sections
(a) through (g) occur. The Target Cost will be adjusted by the estimated increase or decrease in Chargeable Costs caused by one of the conditions set forth in Sections (a) through (g) below:

(a) Client Elected Changes;
(b) Client ‘s Directive if and to the extent this constitutes a Change
(c) Unforeseen and Differing Site Conditions;
(d) Material breach or material delay of Client’s obligations or an event for which the Client has the responsibility.
(e) A change in the Applicable Law or regulations or individual decisions from a Governmental Authority that affects the estimated Chargeable Cost , and provided that such change could not have been reasonably expected o r foreseen by the Designer or Contractor ;
(f) Client ‘s suspension of the Work per Section 18.2 18.2 and
(g) Reconciliation of Allowance items to actual cost

11.2 Changes to Contract Time
The Contract Time will be increased by the number of days the Project’s critical path was lengthened by a Permitted Delay (as listed below), regardless of any concurrent delay caused by any fault, neglect, act, or omission of the Designer, Contractor, or its re spective employees, consultants, subcontractors, or suppliers. The following is a list of Permitted Delays:

(a) Client Elected Changes ;
(b) Client ‘s Directive if and to the extent this constitutes a Change
(c) Unforeseen and Differing Site Conditions;
(d) Material bre ach or material delay of Client’s obligations or an event for which the Client has the responsibility.
(e) A change in the Applicable Law or regulations or individual decisions from a governmental authority that affects the estimated Contract Time, and provide d that such change could not have been reasonably expected or foreseen by the Designer or Contractor;
(f) Client ‘s suspension of the Work per Section 18.2 18.2 and
(g) A Force Majeure event

11.3 Changes to ICL
A permitted change to Target Cost according to Section 11.1 will unless otherwise is decided by IPD P (or PSC) according to Article 4, result in an adjustment to the ICL. The ICL adjustment shall be the product of (a) the ICL Change Order Limitation percentage applicable to a Risk/Reward Team Member whose portion of the Work has changed and (b) the anticipated change in Chargeable Costs of the Risk/Reward Team Member.

11.4 Change Order Procedure
Change Orders will be used to document changes to the Project Objectives and will include approved adjustment to the Target Cost, Contract Time, and ICL. Adjustments to the ICL must be tracked in accordance with the distribution chart set forth in Exhibit G for each approved Change Order. Any Party may request a Change Order to this Agreement if any of the circumstances set out in Section 11.1 to 11.3 above occur by providing the IPD P with a written Change Order Request (“COR”) setting forth the nature of the change, the reason for the change, and the effect, if any, on the Target Cost, Contract Time, or ICL. All CORs must be submitted to the IPD P without undue delay after discovering the condition or circumstances necessitating the change.
The IPD P will without undue delay review the COR and (i) accept the request, (ii) accept the request in part or with modification, (iii) request additional information or perform its own investigation, or (iv) deny the COR. If a COR is accepted by the IPD P, then the IPD P will execute the Change Order. Any disagreements with regard to a COR will be determined according to the decision procedures in Sections 4.1. 9 and 4.3, and if unresolved, are subject to dispute resolution under Article 19.

11.5 Client’s Directive
When Client issues a Client’s Directive, Designer and Contractor must separately track their Chargeable Costs incurred in complying with the Client’s Directive and indicate on the applicable payment application(s) which Chargeable Costs are for a particular Client’s Directive.

 

 

Tjeklister til digitale krav

Samlet kontrakt
Link to: Datamodel
Datamodel
Link to: Digitalt samarbejde
Digitalt samarbejde
Link to: Digitale bygningsmodeller
Blyant og lineal
Digitale bygningsmodeller
Link to: Bæredygtighed
Bæredygtighed
Link to: Digitalt udbud
udbud
Digitalt udbud
Link to: Mængder
Mængder
Link to: Ændringer
Ændringer
Link to: kvalitetssikring, mangler og digital aflevering
Kvalitetssikring, mangler og digital aflevering

Om Bygherreforeningen

Bygherreforeningen er interesseorganisationen for professionelle bygherrer i Danmark. Som aktiv partner i byggeriet påvirker foreningen rammerne gennem dialog og samarbejde med andre interesseorganisationer, offentlige styrelser, ministerier og brugere.

Om Bygherreforeningen
Om Medlemskab

Genveje

  • Bæredygtighed
  • AB18-guiden
  • Bygherreakademi
  • Arrangementer
  • Netværk
  • Nyheder
  • Temaer
  • Indflydelse
  • Bliv medlem
  • Om Bygherreforeningen

Om Bygherreforeningen

  • Job
  • Om Bygherreforeningen
  • Kontakt
  • Presse
  • English
  • Filarkiv
  • Persondatapolitik

Kontakt

Bygherreforeningen
BLOX, Bryghuspladsen 8
1473 København K
Telefon: 7020 0071
info@bygherreforeningen.dk

Faktura: faktura@bygherreforeningen.dk

CVR: 24202674

Sociale medier

Facebook Linkedin Twitter Instagram
Copyright Bygherreforeningen 2024 © Produced by KathArt Interactive - Billedrettigheder tilhører Kontraframe medmindre andet er angivet.
Scroll to top

Få den nyeste viden fra Bygherreforeningen i din indbakke

Ja tak – send mig Bygherreforeningens nyhedsbrev

Close the CTA
Administrer samtykke
For at give dig de bedste oplevelser bruger vi teknologier som cookies til at gemme og/eller få adgang til enhedsoplysninger. Hvis du giver dit samtykke til disse teknologier, kan vi behandle data som f.eks. browsingadfærd eller unikke ID'er på dette websted. Hvis du ikke giver dit samtykke eller trækker dit samtykke tilbage, kan det have en negativ indvirkning på visse funktioner og egenskaber.
Funktionsdygtig Altid aktiv
Den tekniske lagring eller adgang er strengt nødvendig med det legitime formål at muliggøre brugen af en specifik tjeneste, som abonnenten eller brugeren udtrykkeligt har anmodet om, eller udelukkende med det formål at overføre en kommunikation via et elektronisk kommunikationsnet.
Præferencer
Den tekniske lagring eller adgang er nødvendig for det legitime formål at lagre præferencer, som abonnenten eller brugeren ikke har anmodet om.
Statistikker
Den tekniske lagring eller adgang, der udelukkende anvendes til statistiske formål. Den tekniske lagring eller adgang, der udelukkende anvendes til anonyme statistiske formål. Uden en stævning, frivillig overholdelse fra din internetudbyders side eller yderligere optegnelser fra en tredjepart kan oplysninger, der er gemt eller hentet til dette formål alene, normalt ikke bruges til at identificere dig.
Marketing
Den tekniske lagring eller adgang er nødvendig for at oprette brugerprofiler med henblik på at sende reklamer eller for at spore brugeren på et websted eller på tværs af flere websteder med henblik på lignende markedsføringsformål.
  • Vælg muligheder
  • Administrér tjenester
  • Administrer {vendor_count} leverandører
  • Læs mere om disse formål
Se præferencer
  • {title}
  • {title}
  • {title}